hello@isignage.sg WhatsApp +65 8555 9222
Signage typeNon-illuminated / optionally halo 3D mini letters
VenueOffice reception / lift lobby
MaterialsAcrylic or stainless letters, standoffs, painted or vinyl colour to brand
IlluminationUsually none; halo-lit when the wall and power allow
FabricationLaser / CNC letters, finished and spaced on a workshop jig
InstallationAfter-hours CBD / office slot; BM rules on drilling observed
MountingStandoffs or studs into a prepared substrate (pattress on gypsum)
AccessInternal; loading bay booking for the building
TimelineAbout 1–2 weeks fabrication; install in a 2–4 hour night slot if the wall is ready

Reception letters are a spacing job. We jig the word in the workshop so the installer is not inventing kerning on a ladder. Where the wall was gypsum, a plywood pattress went in first — stainless on plasterboard alone is a callback.

Building management had a say on drilling stone. When they said no, the fallback is a backing panel or a floor-standing directory, not a hidden blob of glue.

Photos

mini-letter-1mini-letter-2mini-letter-3mini-letter-4mini-letter-5mini-letter-6