Office reception letters — indoor 3D logo
| Signage type | Non-illuminated / optionally halo 3D mini letters |
|---|---|
| Venue | Office reception / lift lobby |
| Materials | Acrylic or stainless letters, standoffs, painted or vinyl colour to brand |
| Illumination | Usually none; halo-lit when the wall and power allow |
| Fabrication | Laser / CNC letters, finished and spaced on a workshop jig |
| Installation | After-hours CBD / office slot; BM rules on drilling observed |
| Mounting | Standoffs or studs into a prepared substrate (pattress on gypsum) |
| Access | Internal; loading bay booking for the building |
| Timeline | About 1–2 weeks fabrication; install in a 2–4 hour night slot if the wall is ready |
Reception letters are a spacing job. We jig the word in the workshop so the installer is not inventing kerning on a ladder. Where the wall was gypsum, a plywood pattress went in first — stainless on plasterboard alone is a callback.
Building management had a say on drilling stone. When they said no, the fallback is a backing panel or a floor-standing directory, not a hidden blob of glue.






